SO.
This post will just be a quick summation of what we have achieved for the duration of our design project.
Our idea for the project is a Christmas tree that moves to the sound of music. Accessories of the tree include a blinking led which will be put at the top of the tree inside the star.
We ordered our sound sensor piece and got it work beautifully.
We created all of our components and parts on solid works such as the frame of the tree, the star of the tree, and the platform on which the tree will be mounted on. We completed and submitted our designs and should be expecting them by the our next meeting, sometime after returning from Thanksgiving break.
We have a working prototype for our code and it's a work in progress. It'll be ready in no time.
More detailed documentation are posted in blog.
We've had a total of 4 meetings so far.
Meeting 1: November 13@3
Duration: 55 min
Attendance: Devon, Rachael, Kelly
Our goal for this meeting was to have a solid idea and what were doing for the project. It was achieved by the tree idea and we ordered our sensor to get the plan into motion.
Goal attained.
Meeting 2: November 20@3
Duration: 50 min
Attendance: Devon, Rachael, Kelly
Our goal for this meeting was to go through the list of materials we were going to need to assemble everything. We drew out prototypes and started solid works.
Goal attained.
Meeting 3: November 25@10
Duration: N/A
Attendance: Devon, Rachael
Our goal for this meeting was to work on the platform and how to incorporate the blinking led into the star.
Goal attained.
Meeting 4: November 26@12:30
Duration: 45 min
Attendance: Devon, Rachael, Kelly
Our goal in this meeting was to complete our designs for submission. We finished and modified our frame and star and had them ready.
Goal attained.
Next meeting, meeting 5,
sometime after the break.